Wuhan Ligong Daxue Xuebao (Jiaotong Kexue Yu Gongcheng Ban)/Journal of Wuhan University of Technology (Transportation Science and Engineering)

About the Journal

[This article belongs to Volume - 47, Issue - 01]

Abstract :

Rockburst hazards induced by high geostress are particularly prominent during the construction of underground engineering. Prevention and control of rockburst is still a global challenge in the field of geotechnical engineering, which is of great significance. Based on the tunnel group of the Jinping II hydropower station of China, this paper analyzed the mechanical principle of support in the process of construction, and discussed in detail the active release and passive support by numerical simulation and field application. The results show that as two active measures, stress relieve holes and advanced stress relief blasting can release the energy of the microseismic source and transfer the high stress to the deeper surrounding rock, make the surface rock wall with a relatively low stress act as a protective barrier. Their stress release rate is about 12% and 33% in this project, respectively. In term of passive measure, the combined rapid support, which is mainly composed of water swelling anchor and nano-admixture shotcrete, is also an effective way to prevent and control the rockburst under high geostress.